Tuesday, March 22, 2011

Installation of A/C Unit

The air conditioning unit was installed on the west wing today (the unit on the east wing has been in place for a few days), and we were lucky enough to get some photos of the process.  It involved a 200-ton capacity crane with 250 feet of boom.  The A/C unit itself is about the size of a school bus.  Take a look below!