Friday, May 6, 2011

Book Sale!

Most of you are probably aware that the library has an ongoing book sale where we sell paperbacks, hardbacks, audiobooks, and VHS movies throughout the year.  These items are usually priced somewhere between 25 cents for a paperback to a dollar for a hardback.

Well, the walls are moving in (quite literally - the temporary walls are being moved in further to the existing library space), and as a result, storage space is at a premium.  In order to clear out some space, the library has decided to reduce all book sale items to ten cents each.  This means that instead of paying a dollar to get one hardback book, you could pay a dollar and get TEN hardbacks.  With this system, the library and its customers both benefit - we get the much-needed space and you get even more reading material.

This price reduction is temporary, so we hope you'll come by soon and look through the hundreds of items offered for sale.  The majority of the items are set up in boxes near the back wall, and we also have a few carts of books near the front door.

Questions?  Give us a call at 936-291-5472.  Happy shopping!

Tuesday, April 19, 2011

A little color

Things are looking a bit more colorful around the new library wings these days thanks to the bright green siding/insulation that has been installed.


Tuesday, March 22, 2011

Installation of A/C Unit

The air conditioning unit was installed on the west wing today (the unit on the east wing has been in place for a few days), and we were lucky enough to get some photos of the process.  It involved a 200-ton capacity crane with 250 feet of boom.  The A/C unit itself is about the size of a school bus.  Take a look below!
















Wednesday, February 16, 2011

Continuing Work on the New Wings

Work is continuing on the new wings!  The landscape is changing on a daily basis as the construction crew makes headway on the new library.  Check out the photos below of the latest progress, and be sure to take a look at the slideshow, which includes more photos not seen here.

Progress on the west wing
Supports are constructed on the new east wing.
The east wing gains a roof.

Friday, January 28, 2011

The West Wing Goes Up

Support beams and trusses for the west wing have gone up, and the foundation has been poured for the east wing.  For even more photos, view the slideshow at Flickr.

The support beams go up on the west wing.

Work continues the next day...

...and the next one, when the trusses are installed.

A view of the new west wing from Avenue M.
The concrete foundation for the new east wing.

Monday, December 13, 2010

Forever Bricks Fundraiser

Make your mark on the new library!  The Huntsville Library and the Library Board are selling "Forever Bricks" to give the community an opportunity to make a lasting impression upon the new library building.  A personalized brick is an ideal way to honor a loved one or demonstrate your own commitment to the mission of the public library.  These "Forever Bricks" will make up the Plaza at the new entrance near 13th Street.

Each 4" x 8" "Forever Brick" is fired and guaranteed to last as least as long as the life of the library building.  The bricks are being sold for $20 each and can be engraved with up to two lines of text of the purchaser's choosing.  If you would like to contribute, fill out the form by clicking on one of the links below, print it out, and bring it by the library or mail it to us with your check made out to Huntsville Public Library.  Use the first link if you have Infopath on your computer, and use the second link if you do not.

Temporary Walls and Concrete

Things are feeling a little claustrophobic at the library lately.  Temporary walls have been built inside the library in preparation for the existing walls to be torn down, and it's made the space inside a little smaller.  It's all worth it, though, since the end result will be a library building more than three times as large as the current one.  

Concrete has also been poured for the new west wing.  Check out the photos of the action below, and be sure to click on each image to enlarge it.  We've also set up a Flickr stream so you can see all the photographs of the renovation and expansion in one place.  It's got all of the photos from the blog as well as a few extras.  Go here to see it.


Children's Coordinator Janelle Valera helps mark off the north side of the building while the temporary walls are built.
The frame goes up on the east side.
Another shot of the frame on the east side.

A behind the scenes look of the action.
The completed frame on the east side.
The north side of the building before the temporary wall is built.
The sheet rock goes up.
The gaps are filled in with putty.
A shot of the west side foundation.